Bathroom Remodel

Work Done

  • Full bathroom demo
  • Drain reconfiguration
  • Shower base install
  • Ceramic tile work
  • Window stone detail
  • Fixture replacement
  • Ventilation and lighting

This bathroom remodel started with a full tear-out of the existing tub, wall tile, floor finishes, sink, and toilet. With the room opened up, the plumbing and drainage were reconfigured for the new shower and fixture layout to improve function and long-term serviceability.

The installation phase included new ceramic floor tile, a new shower base, and new tile on the shower walls. Stone was installed around the window as a durable finishing detail. The final fixture package included a new toilet, sink, mirror, bathroom fan, a recessed shower light, and vanity-area lighting.

From demolition through finish, the work focused on delivering a cleaner layout and a fully updated bathroom envelope. The final space reflects a practical, durable remodel designed for daily use and easier maintenance.

Ready to Start?

Request a Quote